1st Day
1. Take off the holders that hold the gantry
2. Install the computer
3. Make the levelation
4. Change the Laserhead driver if it´s necessary.
5. Put the arms inside the resonator cabinet and place it on the machine
6. Put the white arms on the side of the machine and the black ones in the back (Short ones left side of machine)
7. Put the rails.
2nd Day
8. Put the resonator
9. Take the Fiber to the Laserhead position.
10. Install Laserhead
11. Put the gray bottom-back covers
12. Put the white back Cover
13. Put the belts to the transmission system
14. Put all the gray bottom covers
15. Put the white doors
3rd Day
16. Put the protectors to the slide doors
17. Install the air conditioning
18. Install the oil tank
19. Connect the chiller
20. Make the electrical connections
4th Day
21. Make the gas connections
22. Turn on machine