Star machine auxiliary equipment connections / Daniel
For the dual chiller inlet use only one inlet A, loop a hose in inlet B and outlet B. filled with distilled water until reaching the green level on the gauge.
connect the alarm cable in the back of the chiller as shown in the photo below
Check the water pipe cross-connection as shown in the photo
Star Machine connections Connection in the back of the chiller.
double inlet Chiller connections
Air pump connection
if the machine doesn´t come with the push-to-connect fitting,
you can do this connection with the chiller hose and zip tie.
Related Articles
3 - Easy CO2 Auxiliary Equipment connection / Daniel
To connect the auxiliary equipment of a CO2 machine follow the next videos Exhaust fan connection https://youtu.be/5rzzkRV7fWA?list=PLXWt--vtyu_xh-fNWXevHN537tsZUN3LP compressor connection ...
Installing the lens in a CO2 Star Machine / Daniel
Different positions of the lenses inside the barrel Focal Length of lenses Different positions of the lens in the barrel Position of the lens inside the barrel, Remember the convex part must be place facing the mirror, flat part to the material ...
Space Saver Electric Connections / Engineer David
This simple diagram will help you to understand how to make the connections for the electric and power part for the machine: Fiber Laser Department
FLY 3015 Electric connections / Engineer David
This simple diagram will help you to understand how to make the connections for the electric and power part for the machine: If you have to install the dust collector ask for help Fiber Laser Department
1- Easy Machine and Worktable Leveling / Daniel
To leveling the machine and the worktable follow the next videos To place Knife blades and honey comb https://youtu.be/JrrI6uHG49o To level the machine https://youtu.be/1N5zerEiXuE To level the worktable https://youtu.be/xj9Kzh8Qhkk